canonical_url: "https://csls.ca/ipm-archive/issue-1/what-does-total-factor-productivity-measure/"
title: "What Does Total Factor Productivity Measure?"
author:
  name: "CSLS"
  url: "https://csls.ca/author/cslc/"
date_published: "2026-07-10T09:12:40+00:00"
date_modified: "2026-07-13T06:38:06+00:00"
post_type: "ipm"
summary: ""
ipm_issue_period:
  - "Fall 2000"
ipm_keyword:
  - "externalities"
  - "general purpose technologies"
  - "growth theory"
  - "measurement"
  - "natural resources"
  - "productivity paradox"
  - "technological change"
  - "TFP"
ipm_research_theme:
  - "Measurement and methodology"
ipm_country_focus:
  - "International"
featured_image: "https://csls.ca/wp-content/uploads/2026/06/IPM_50_banner.webp"
status: "publish"
---

# What Does Total Factor Productivity Measure?

Canonical URL: https://csls.ca/ipm-archive/issue-1/what-does-total-factor-productivity-measure/

# What Does Total Factor Productivity Measure?

[Download full PDF article](https://csls.ca/wp-content/uploads/2026/07/IPM-Issue-1-6-Lipsey-Carlaw.pdf)

Cite this article

×
Cite this article as:

Lipsey, Richard, and Kenneth Carlaw. 2000. “What Does Total Factor Productivity Measure?” International Productivity Monitor, No. 1 (Fall 2000): 31–40. https://www.csls.ca/ipm-archive/issue-1/what-does-total-factor-productivity-measure/

## Authors:

-
Richard Lipsey
Department of Economics, Simon Fraser University

-
Kenneth Carlaw
Department of Economics, University of Canterbury

## IPM Issue 1

Fall 2000 pp. 31–40

## Related IPM articles

[Is the SNA Still Useful? A Review Article on The Measure of Progress: Counting What Really Matters

Paul Schreyer

Fall 2025 | IPM Issue 49 | pp. 116–124](https://csls.ca/ipm-archive/ipm-issue-49/is-the-sna-still-useful-a-review-article-on-the-measure-of-progress-counting-what-really-matters/)
[Efficiency Adjustment of Hours Worked: Two Possible Modifications of a Jorgensen Production Model

Barbara Fraumeni

Fall 2025 | IPM Issue 49 | pp. 103–115](https://csls.ca/ipm-archive/ipm-issue-49/efficiency-adjustment-of-hours-worked-two-possible-modifications-of-a-jorgensen-production-model/)

[Labour Productivity as a Measure of Technological Change

Ulrich Kohli

Fall 2025 | IPM Issue 49 | pp. 64–81](https://csls.ca/ipm-archive/ipm-issue-49/labour-productivity-as-a-measure-of-technological-change/)
[The Relationship between Efficiencies Defenses for Mergers and TFP Growth

Robin Shaban

Fall 2025 | IPM Issue 49 | pp. 82–102](https://csls.ca/ipm-archive/ipm-issue-49/the-relationship-between-efficiencies-defenses-for-mergers-and-tfp-growth/)

[IPM Issue 49 Editors’ Overview

Andrew Sharpe, Bart van Ark, Paul Schreyer

Fall 2025 | IPM Issue 49 | pp. 1–2](https://csls.ca/ipm-archive/ipm-issue-49/)
[The UK Productivity Slowdown: A Review of Timing, Magnitude, and Drivers

Josh Martin

Spring 2025 | IPM Issue 48 | pp. 1–34](https://csls.ca/ipm-archive/ipm-issue-48/the-uk-productivity-slowdown-a-review-of-timing-magnitude-and-drivers/)

[Appendix: UK Productivity Growth Rates Across Data Vintages and Studies

Josh Martin

Spring 2025 | IPM Issue 48 | pp. 65–73](https://csls.ca/ipm-archive/ipm-issue-48/appendix-uk-productivity-growth-rates-across-data-vintages-and-studies/)
[Opportunities and Risks of Artificial Intelligence for Productivity

Francesco Filippucci, Peter Gal, Katharina Laengle, Matthias Schief, Filiz Unsal

Spring 2025 | IPM Issue 48 | pp. 1–26](https://csls.ca/ipm-archive/ipm-issue-48/opportunities-and-risks-of-artificial-intelligence-for-productivity/)

[Cracking the Productivity Code: An International Comparison of UK Productivity

John Van Reenen, Xuyi Yang

Spring 2024 | IPM Issue 46 | pp. 60–82](https://csls.ca/ipm-archive/ipm-issue-46/cracking-the-productivity-code-an-international-comparison-of-uk-productivity/)
[Appendix: EUKLEMS & INTANProd Industry Coverage and Intangible Asset Treatment

Filippo Bontadini, Carol Corrado, Jonathan Haskel, Massimiliano Iommi, Cecilia Jona-Lasinio, Tsutomu Miyagawa

Spring 2024 | IPM Issue 46 | pp. 1–4](https://csls.ca/ipm-archive/ipm-issue-46/appendix-euklems-intanprod-industry-coverage-and-intangible-asset-treatment/)

## Abstract

## Résumé

EN
FR

Copy link

Email

LinkedIn

This article critically examines what total factor productivity (TFP) does and does not measure, arguing that TFP cannot simultaneously capture all technological change and just the free gifts from externalities and scale effects. The authors use the concept of general purpose technologies (GPTs) and the role of natural resources to show that major technological changes need not register in TFP measures, and that low TFP numbers do not indicate low technological dynamism. They conclude that the degree of confusion surrounding TFP justifies dropping it from discussions of long-term economic growth, or at minimum attaching a caveat that changes in TFP do not measure technological change.

Cet article examine de façon critique ce que mesure et ne mesure pas la productivité multifactorielle (PMF), soutenant que la PMF ne peut pas simultanément saisir tous les changements technologiques et les seuls effets externes et d’échelle. Les auteurs utilisent le concept de technologies à usage général et le rôle des ressources naturelles pour montrer que des changements technologiques majeurs ne se reflètent pas nécessairement dans les mesures de PMF, et que de faibles chiffres de PMF n’indiquent pas un faible dynamisme technologique. Ils concluent que le degré de confusion entourant la PMF justifie de l’écarter des discussions sur la croissance économique à long terme, ou à tout le moins d’y joindre la mise en garde que les variations de PMF ne mesurent pas le changement technologique.

[Download full PDF](https://csls.ca/wp-content/uploads/2026/07/IPM-Issue-1-6-Lipsey-Carlaw.pdf)